Year 2011
|
|
|
|
Woodside Energy Ltd |
Greater Western Flank, North West Shelf, Western Australia |
Geotechnical Interpretative Report |
|
Woodside Browse Pty Ltd |
Browse Project, North West Shelf, Western Australia |
Onshore & Nearshore Site Investigation Support |
|
Woodside Energy Ltd |
Browse Project, North West Shelf, Western Australia |
Pipeline FEED-level Design and Planning |
|
Woodside Energy Ltd |
Greater Western Flank, North West Shelf, Western Australia |
Phase 1 Pipe-Soil-Interaction Study |
|
Woodside Energy Ltd |
Greater Western Flank, North West Shelf, Western Australia |
Provision of Client Representation during Site Investigation |
|
Woodside Energy Ltd |
Greater Western Flank, North West Shelf, Western Australia |
GWF- Geotech Interpretative Report 2011 |
|
Woodside Energy Ltd |
North Rankin B, North West Shelf, Western Australia |
NRB- Follow-on Engineering Support |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Infield SI & Interpretative Report |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
West Tryal Rocks-Conductor Geotechnical Design Review |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone Expansion- Geohazard Support |
|
Apache Energy Limited |
Julimar Project, North West Shelf, Western Australia |
Preparation of Site Invetsigation Scope of Work |
|
Granherne Pty Ltd |
Gaz de France, Joseph Bonaparte Gulf, Northern Territory |
FEED-level Foundations Design |
|
Origin Energy Resources Limited |
Geographe Field, Bass Strait, Australia |
Site Investigation and Geophysical Survey Support and Concept Assistance |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Yolla Platform - Mid Life Assesssment -3D Analysis of Raft - Spudcan Crater Interaction |
|
IntecSEA Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Geotechnical Pipeline Design Support |
|
IntecSEA Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
FEED-level Design of Platform Foundations |
|
IntecSEA Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
FEED-level Design of Foundation of Subsea Structures |
|
IntecSEA Pty Ltd |
Gendalo Development, Indonesia |
Geohazard Assessment |
|
BHP Billiton |
Macedon Project, North West Shelf, Western Australia |
Geotechnical Interpretative Report |
|
BHP Billiton |
Macedon Project, North West Shelf, Western Australia |
Long-term storage of samples |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Liquefaction Analysis |
|
PT Opac Barata |
Tangguh Field, Indonesia |
Site Investigation Support |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Geotechnical Design of Subsea Structure Foundations |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Technical Support for Gorgon Upstream Team |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Geotechnical Design of Pipeline and Umbilical Crossings |
|
Vibro-Pile (Aust) Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Pile Driveability Assessment and Provision of Geotechnical Risk Advice
|
|
Shell Philippines Exploration B.V. |
Malampaya Project, Philippines |
Technical Support for Site Investigation Vessel Inspection |
|
TSMarine Pty Ltd |
Project in Papua New Guinea |
Site Investigation Supervision and Support |
|
Shell Develpoment (Australia)Pty Ltd |
Prelude Development, Western Australia |
Assessment of Thermal Movements of Well Conductors |
|
SBM Atlantia Inc |
Browse Project, North West Shelf, Western Australia |
Support for Design of the Tension-Leg Platform Foundations |
|
McDermott Engineering LLC |
Browse Project, North West Shelf, Western Australia |
FEED-level Foundation Design of the Central Processing Facility |
|
URS Corp |
North West Shelf, Western Australia |
Probabilistic Seismic Hazard Assessment Support |
Year 2010
|
|
|
|
Woodside Energy Ltd |
Browse Project, North West Shelf, Western Australia |
Provision of Specialist Support to Woodside In-House |
|
Woodside Browse Pty Ltd |
Browse Project, North West Shelf, Western Australia |
Browse Development - Probabilistic Seismic Hazard Assessment |
|
Woodside Browse Pty Ltd |
Browse Project, North West Shelf, Western Australia |
Lab testing, scoping & interpretation |
|
Woodside Energy Ltd |
Browse Project, North West Shelf, Western Australia |
Onshore/Nearshore Site Investigation Support |
|
Woodside Browse Pty Ltd |
Browse Project, North West Shelf, Western Australia |
Technical Review of Site Investigation Reports |
|
Woodside Energy Ltd |
Pluto Project, North West Shelf, Western Australia |
Steel-Catenary-Riser Soil-Interaction Study |
|
WorleyParsons |
Browse Project, North West Shelf, Western Australia |
Browse to Burrup - Lab Testing Coordination and Interpretative Reporting |
|
J P Kenny |
Ichthys Project, Timor Sea |
Pipeline Soil Interaction for the Gas Export Pipeline |
|
J P Kenny |
Ichthys Project, Timor Sea |
Seismic and Wave Induced Liquefaction of the Seabed |
|
J P Kenny |
Ichthys Project, Timor Sea |
Scour Assessment, Testing and Analysis |
|
J P Kenny |
Ichthys Project, Timor Sea |
Pipeline Crossing Foundation Design |
|
J P Kenny |
Ichthys Project, Timor Sea |
Sand Wave Mobility Assessment |
|
J P Kenny |
Ichthys Project, Timor Sea |
Seabed Slope Stability Assessment |
|
J P Kenny |
Ichthys Project, Timor Sea |
Pipeline-Seabed Interaction Centrifuge Modellling |
|
J P Kenny |
Ichthys Project, Timor Sea |
Pipeline-Seabed Interaction for In-field Flowlines |
|
J P Kenny |
Ichthys Project, Timor Sea |
Export Riser Base Foundation Design |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser Support Structure Foundation Design |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser-Base Foundation Design |
|
J P Kenny |
Ichthys Project, Timor Sea |
PLET & FLET Foundation Design |
|
J P Kenny |
Ichthys Project, Timor Sea |
Foundation Design for Secondary Subsea Structures |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser Support Structure Preliminary Base Sizing for Revised Loads |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser Support Structure Foundation Screening Study |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser Support Structure Installation Advice |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser Support Structure Geotechnical Properties for Basis of Design |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser Support Structure Seabed Response Spectra Assessment |
|
J P Kenny |
Ichthys Project, Timor Sea |
Riser Support Structure Seismic- Induced Liquefaction Analysis |
|
J P Kenny |
Ichthys Project, Timor Sea |
Reassessment of Free-Field Seismic Liquefaction |
|
J P Kenny |
Ichthys Project, Timor Sea |
Assessment of Riser Support Structure Foundation under Seismic Loading |
|
Technip Oceania Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Design of Central Process Platform Foundations |
|
Technip Oceania Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Design of Subsea Structure Foundations |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Long-Term Climate Controlled Storage of Samples |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Support to Site Investigation & Trenching Trials |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Lab Testing & Geotechnical Interpretative Report for Wheatstone Platform |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Lab Testing & Geotechnical Interpretative Report for In-field Infrastructure |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Lab Testing & Geotechnical Interpretative Report for Export Pipeline |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Specialist Model Testing |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Specialist Geohazard Logging |
|
Chevron Australia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Paleontological Logging for Gorgon Expansion |
|
Esso Australia Resources Pty Ltd |
Scarborough Field, North West Shelf, Western Australia |
Specialist Geohazard Logging |
|
Esso Australia Resources Pty Ltd |
Scarborough Field, North West Shelf, Western Australia |
Geotechnical Logging & Testing |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Yolla Plaftorm Mid-Life Re-analysis for Revised Loads |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Jack-Up Repenetration Studies |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Sample Storage and Handling |
|
Santos Ltd |
Joseph Bonaparte Gulf, Northern Territory |
Review of Jack-Up Spudcan Penetration Predictions |
|
BHP Billiton |
Macedon Project, Exmouth Gulf, Western Australia |
Export Pipeline Investigation Supervision |
|
BHP Billiton |
Macedon Project, Exmouth Gulf, Western Australia |
Offshore In-Field Investigation Supervision |
|
BHP Billiton |
Macedon Project, Exmouth Gulf, Western Australia |
Sample Handling, Testing, Interpretration and Reporting |
|
BHP Billiton |
Macedon Project, Exmouth Gulf, Western Australia |
Scour Assessment |
|
BHP Billiton |
Macedon Project, Exmouth Gulf, Western Australia |
Macedon- Pipeline Soil Interaction Parameters |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Supervision of Site Investigation Activities |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Scoping and Plannning of Site Investigation Activities |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Scoping and Management of Laboratory Testing |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Geotechnical Interpretative Report |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Geotechnical Support for the FPU/FPSO |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Centrifuge Model Testing of Gas Export Pipeline |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Pipeline-Soil Interaction Parameters for Gas Export Pipeline |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
On Bottom Stability Modelling of Gas Export Pipeline |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Misc Advice on GEP to end of 2011 |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys -Flowline Soil Interaction Parameters Update |
|
BGEPIL |
Offshore India |
Panna - PL Platform Foundation Review |
|
PT Opac Barata |
Abadi Development, Indonesia |
Abadi -Tendering of Geotech Contracts |
|
Shell Global Solutions International BV |
Prelude Development, North West Shelf, Western Australia |
Subsea Foundation Study |
|
Shell Global Solutions International BV |
Prelude Development, North West Shelf, Western Australia |
Conductor Analysis |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Scour Assessment around Subsea Structures |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Site Response Analysis |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Slope Stability of N1K Scarp Crossing Trench |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Erosion Resistance Testing |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Design of Flowline Anti-Burial Mattresses & Support Structures |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon/Jansz-Seismic Study |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Partially-Drained Pipeline-Seabed Interaction Model |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Assessment of Scour around Gorgon subsea structures |
|
Keppel Offshore & Marine Technology Centre Pte Ltd |
Filanovsky Development |
Filanovsky - FEED Study |
|
Shell Philippines Exploration B.V. |
Camago Development, Malampya, Philippines |
Malampaya Phase 2 (Camago)- Lab Testing & Interpretative Reporting |
|
Xodus Group |
Queensland Curtis LNG Project, Queensland |
Provision of Client Representatives for Geotechnical Investigations |
|
QGC Limited |
Queensland Curtis LNG Project, Queensland |
Narrows Crossing - Fault Reconnaissance |
|
Cube Offshore Pty Ltd |
Pyrenees Development, North West Shelf, Western Australia |
Geotechnical Analysis of Subsea Structures |
|
Shell Develpoment (Australia) Pty Ltd |
Deepwater North West Shelf, Western Australia |
Geotechnical Support |
|
GDF Suez Bonaparte Pty Ltd |
Joseph Bonaparte Gulf, Northern Territory |
Preparation of Scope of Work for Geotechnical Investigations |
|
GDF Suez Bonaparte Pty Ltd |
Joseph Bonaparte Gulf, Northern Territory |
Geophysical Survey Report Evaluation |
|
GDF Suez Bonaparte Pty Ltd |
Joseph Bonaparte Gulf, Northern Territory |
Field Supervision of Offshore Investigation |
|
GDF Suez Bonaparte Pty Ltd |
Joseph Bonaparte Gulf, Northern Territory |
Sample Storage, Manangement, Testing & Production of Interpretative Report |
|
GDF Suez Bonaparte Pty Ltd |
Joseph Bonaparte Gulf, Northern Territory |
Seismic Hazard Assessment |
|
FloaTEC LLC |
Browse Project, North West Shelf, Western Australia |
Preliminary Geotechnical Support |
|
Lloyds Register EMEA |
Global |
Revision of LR Classification Rules for Anchors |
|
Woodside Energy Ltd |
Browse Project, North West Shelf, Western Australia |
Geotechnical Site Investigation & Interpretative Report |
Year 2009
|
|
|
|
Woodside |
Pluto Project, North West Shelf, Western Australia |
Additional Geotechnical Site Investigation & Interpretative Report |
|
Nautilus Minerals Niugini Ltd |
Queensland, Australia |
Consultancy for Seafloor Drilling Programme |
|
Woodside Burrup Pty Ltd |
North West Shelf |
Pluto LNG Proj: Pile Installation Representation |
|
PT WorleyParsons Indonesia |
Tangguh LNG Project, Indonesia |
Tangguh ROA Platform |
|
TS Marine Pty Ltd |
Western Australia |
Geotechnical Market Study and Report |
|
TS Marine Pty Ltd |
North West Shelf |
Geotechnical Consultancy Services - Pile Driving Analysis |
|
Woodside Energy Ltd |
North West Shelf |
Goodwyn A - Re-assessment |
|
Woodside Energy Ltd |
North West Shelf |
NRA-Reassessment (Phase 1) |
|
Xodus Group |
Indonesia |
Terang Sirasun - Geotechnical Advice |
|
Santos Ltd |
North West Shelf |
Fletcher to Mutineer Flowlines - Desk Study |
|
ChevronAustralia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon Upstream - Data for Liquefaction |
|
Stuart Petroleum Limited |
Timor Sea |
Oliver Location - Desktop Study |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone-Platforms-Transition Engineering Support |
|
Technip Oceania Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Technip FEED |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Infill Surveys Geophysical Support |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon Upstream- Flowline Stabilisation Centrifuge Testing |
|
BHP Billiton |
Pyrenees Project, North West Shelf, Western Australia |
Pyrenees - Review of Drag Anchors for MODU |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Yolla A Platform - Preliminary Analysis for Berm Option |
|
Abu Dhabi Marine Operating Company |
Abu Dhabi |
GPF Project - Review of Installation Documentation |
|
Abu Dhabi Marine Operating Company |
Abu Dhabi |
GPF Project - Offshore Representation for Pile Installation |
|
Abu Dhabi Marine Operating Company |
Abu Dhabi |
GPF Project - Report Compilation |
|
Coogee Resources (Ashmore Cartier) Pty Ltd |
Montara Project, Timor Sea |
Final Pile Sizing; Spudcan Penetration Analysis; Review of 3rd Party Design; Interpretative Report |
|
Woodside Burrup Pty Ltd |
Pluto Project, North West Shelf, Western Australia |
Backfill Liquefaction Study & Pipeline Flotation Assessment |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon Upstream - Jansz Superspan |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon - Implementation of UWAPIPE into ABAQUS |
|
Total AMS Pty Ltd |
Tasmania, Australia |
Tasmania - Superay Anchor Litigation |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys - Additional Well Conductor Casing Design |
|
Coogee Resources (Ashmore Cartier) Pty Ltd |
Montara Project, Timor Sea |
Sample Selection - X-raying and Logging |
|
East Puffin Pty Ltd |
India |
Great Auk - Geotechnical Support Jack-Up Sites |
|
BP Exploration Operating Company |
Angola |
Angola Project - Angolan Pipelines |
|
Chevron Australia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon Development - Geotech Sample Storage |
|
ChevronAustralia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon - Debris Flow Axial Load on Pipelines |
|
J P Kenny |
North West Shelf |
Pluto - Buckle Initiators Remedial Work |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Yolla Site Investigation, Lab Testing & Interpretative Report |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Yolla - Rockhopper & Trefoil 2 Log & Int Report |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Yolla - Sample Storage/Handling |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Yolla A Platform - Mid Life Enhancement |
|
Woodside Energy Ltd |
North West Shelf |
Enfield - Conductor Design Issues |
|
BGEPIL |
India |
West Panna - Investigation of SWP Jacket Incident |
|
Woodside Energy Ltd |
North West Shelf |
NRA - Reassessment Review Documents |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys FEED |
|
Esso Australia Pty Ltd |
Timor Sea |
Marlin B - Spudcan Penetration |
|
Woodside Energy Ltd |
Timor Sea |
Sunrise - Assessment of Pipeline Embedment /Friction Factors |
|
PTTEP Australasia (Ashmore Cartier) Pty Ltd (formerly Coogee Resources Pty Ltd) |
Timor Sea |
Timor Sea Wells - Geotechnical Support |
|
APL |
Brazil |
Peregrino - Installation Driveability Assessment |
|
Woodside Energy Ltd |
NRB Project, North West Shelf, Western Australia |
NR2 Mudmat Reassessment |
|
PT Opac Barata |
Indonesia |
Terang Sirasun - Geotechnical Support |
|
Shell Philippines Exploration B.V. |
Phillipines |
Malampaya Phase 2 (Camago) |
|
Anzon Australia Ltd |
Bass Strait |
Basker Manta - Scope of work and Site Investigation |
Year 2008
|
|
|
|
Origin Energy Resources Limited |
Bass Strait |
Bass Strait Site Survey Work (Yolla and others) |
|
Australian Drilling Associates Pty Ltd |
Bass Basin |
West Triton Preloading at Spikey 1 |
|
Chevron Australia Pty Ltd |
North West Shelf, Western Australia |
Gorgon - PY |
|
Seastream JV Australia Pty Ltd |
Pyrenees Project, North West Shelf, Western Australia |
Pyrenees - Touchdown Checks Crosby MWA |
|
Clough Projects Pty Ltd |
New Zealand |
Maari - Ad-hoc Geotechnical Support- |
|
BHP Billiton |
Exmouth Gulf, Western Australia |
Macedon - Consulting Geotech Tender |
|
Apache Energy Limited |
North West Shelf, Western Australia |
Reindeer - Foundation Design |
|
Esso Australia Pty Ltd |
Timor Sea |
Marlin B - Open Hole Stability |
|
Chevron Australia Pty Ltd |
North West Shelf, Western Australia |
Wheatstone - Downstream Geophysical Support |
|
Chevron Australia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon - Geophysical Support |
|
Technip Oceania Pty Ltd |
Abadi, Indonesia |
Abadi - SI Specifications |
|
Chevron Australia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon - Offshore Represenatation Phase 2 |
|
Chamberlain, Hrdlicka, White, Williams, & Martin Lawyers |
Burma |
Modec Rang Dong FSO - Soils Analysis |
|
Woodside Energy Ltd |
North West Shelf, Western Australia |
NRA - Assurance Review |
|
Vermilion Oil & Gas Australia Pty Ltd |
North West Shelf, Western Australia |
Wandoo B - Geotechnical Review |
|
ENI Australia,Ltd |
Timor Sea |
Blacktip - Spudcan Penetration Analyses |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon - CFD Scour Study |
|
Technip Oceania Pty Ltd |
Abadi, Indonesia |
Abadi - Seismic Design Criteria |
|
Technip Oceania Pty Ltd |
Abadi, Indonesia |
Abadi - Geohazard Screening Study |
|
Esso Australia Pty Ltd |
Timor Sea |
Marlin B - Site Investigation 2 |
|
Banner Engineering Korea Co. Ltd |
Ulsan, South Korea |
SK Energy - Test Procedure for Banner Anchors |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Seabed Structures |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Pipelines and Flowlines |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Offshore Representation |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Engineering |
|
Coogee Resources (Ashmore Cartier) Pty Ltd |
Timor Sea |
Montara - Miscellaneous Advice/Pile Re-Analyses |
|
Chevron Australia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon - Drilling Analysis |
|
BHP Billiton Petroleum (Falklands) Corp |
Falklands |
Falklands Geotechnical Review |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon - Anchor Feasibility Study for Pipelay |
|
Esso Australia Pty Ltd |
Timor Sea |
Marlin B - Interpretative Report |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys GEP to Darwin |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys - Plan G Pile Capacity |
|
BHP Billiton |
Exmouth Gulf, Western Australia |
Macedon - Geomechanics Consulting |
|
Coogee Resources(Ashmore Cartier) Pty Ltd |
Timor Sea |
Montara Project - Pile Installation |
|
Chevron Australia Pty Ltd |
North West Shelf, Western Australia |
Wheatstone - SI Support |
|
BHP Billiton |
Pyrenees Project, North West Shelf, Western Australia |
Pyrenees - Umbilical Design Parameters |
|
Esso Australia Pty Ltd |
Timor Sea |
Marlin B - Geotechnical Investigation |
|
Woodside Energy Ltd |
North West Shelf, Western Australia |
NRA - Reliability Study |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys - Platform Scouting Investigation |
|
ChevronAustralia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Greater Gorgon - Interpretation of Geophysical Samples |
|
BHP Billiton |
Exmouth Gulf, Western Australia |
Macedon - Misc Consulting |
|
WorleyParsons |
Browse Basin |
Browse to Burrup -Phase 2 |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys - Misc Advice |
|
Chevron Australia Pty Ltd |
Greater Gorgon Project, North West Shelf, Western Australia |
Greater Gorgon - Survey Support |
|
CLP Power Hong Kong Limited |
Hong Kong |
CLP- Centrifuge Testing |
|
Uzma Engineering Sdn Bhd |
Malaysia |
Cendor-3: Specialised Engineering Study |
|
Inpex Browse Ltd |
Ichthys Project, Timor Sea |
Ichthys CPF - Pile Anchor Design Review |
|
MISC BERHAD |
Vietnam, South China Sea |
FPSO Anchor Piles - Review of SI Data |
|
Arup |
Turkmenistan |
Turkmenistan (ODP-A) |
|
Chevron Australia Pty Ltd |
Wheatstone Project, North West Shelf, Western Australia |
Wheatstone - Supplementary Geotechnical Support |
|
Technip Oceania Pty Ltd |
Abadi, Indonesia |
Abadi - Pre-FEED SURF Study |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Jansz - Lateral Conductor Response |
|
Icon Engineering Pty Ltd |
Pyrenees Project, North West Shelf, Western Australia |
Pyrenees - Detailed Design of MWA's |
|
GUJV |
Greater Gorgon Project, North West Shelf, Western Australia |
Jansz - Lay Effects on Pipeline Embedment |
|
BHP Billiton |
Pyrenees Project, North West Shelf, Western Australia |
Flowline Design Parameters |
|
APL |
Peregrino Project, South America |
Anchor Pile Design |
|
J P Kenny |
Ichthys Project, Timor Sea |
Post Pre-FEED Miscellaneous Geotechnical Advice |
|
Woodside Burrup Pty Ltd |
Pluto Project, North West Shelf, Western Australia |
Geotechnical Investigation "Choke" Location |
|
Santos |
Jarver-1 Project, Indonesia |
Jarver-1 -Review of Tri-Surv Site Survey |
|
Shell International Exploration and Producion BV |
F-Block, Timor Sea |
F-Block SI |
Year 2007
|
|
|
|
Intec |
Blacktip Project, Timor Sea |
Geotechnical Support |
|
Esso Australia Pty Ltd |
Marlin B, Bass Strait |
Marlin B - Spudcan Pile Interaction Study |
|
Arup |
Browse Basin |
Browse - Preliminary Soil Interpretation for B2k Option |
|
Woodside Energy Ltd |
Vincent Project, North West Shelf, Western Australia |
Review of Drag Anchor Design |
|
Woodside Energy Ltd |
Browse Basin |
Browse to Burrup - Geotechnical Support |
|
Ove Arup and Partners Hong Kong Ltd |
CLP Project, Hong Kong |
CLP Centrifuge Model Testing |
|
BP Exploration Operating Company |
Smartpipe Development, United Kingdom |
Smartpipe Development - Geotechnical Advice |
|
BP Exploration Operating Company |
Greater Plutonio, North West Shelf, Western Australia |
Geotech Interpretation of Lateral Pipe-Soil Interaction Tests (NGI) |
|
GUJV |
Gorgon Project, North West Shelf, Western Australia |
Scour and Self Burial Assessments |
|
Technip Oceania |
Wanaea Cossack, North West Shelf, Western Australia |
CPR - 3 Riser Base Geotechnical Verification |
|
BHP Billiton |
Pyrenees Project, North West Shelf, Western Australia |
Review of Drag Anchors Design |
|
Inpex Masela Ltd |
Abadi, Indonesia |
Geotechnical Support |
|
Woodside Burrup Pty Ltd |
Pluto Project, North West Shelf, Western Australia |
Platform Geotechnical Investigation |
|
Woodside Energy Ltd |
Vincent Project, North West Shelf, Western Australia |
Anchor Verification |
|
Origin Energy Resources Limited |
Yolla Field, Bass Strait, Australia |
Reassessment of Yolla A Foundation Stability |
|
AED Oil Ltd |
Puffin Project, Timor Sea |
Geotechnical Support |
|
AGR Peak Group Asia Pacific Pty Ltd |
Nexus Project, Timor Sea |
Jack-Up Site Investigation- Drillsearch/AED/Santos/Nexus |
|
J P Kenny |
Indonesia |
Ujang- Pangkah Pipelines Remedial Work |
|
Woodside Energy Ltd |
NRB Project, North West Shelf, Western Australia |
Additional CNS Testing |
|
PT Opac Barata (BP Exploration) |
Tangguh LNG Project, Indonesia |
Platforn Scour |
|
Roc Oil (China) Company |
Beibu Gulf, China |
Jack-Up Site |
|
Arup |
MCR-A Project, Turkmenistan |
GBS Detailed Design |
|
Woodside Energy Ltd |
Angel Project, North West Shelf, Western Australia |
Revised Axial Pile Response Analysis |
|
BP Exploration Operating Company |
Tangguh LNG Project, Indonesia |
Miscellaneous Support Services |
|
Woodside Energy Ltd |
Browse Basin |
Offshore LNG Phase 2C Geotechnical Suppport |
|
APL |
Montara Project, Timor Sea |
Driven Anchor Pile Sizing |
|
Woodside Energy Ltd |
NRB Project, North West Shelf, Western Australia |
Detailed Design and FEED Engineering Support |
|
MEO Australia Ltd (MEO) |
NT/P68 & Tassie Shoal, Timor Sea |
Geotechnical Support and Jack-Up Site Assessment |
|
Woodside Burrup Pty Ltd |
Pluto Project, North West Shelf, Western Australia |
Geotechnical Site Investigation |
|
Ove Arup and Partners Hong Kong Ltd |
CLP Project, Hong Kong |
CLP Suction Can Testing Plan |
|
Intec |
Ichthys Field, Timor Sea |
Foundations for Subsea Tower to support Catenary Risers & Feasibility of Foundation for Mid Depth Buoy |
|
Esso Australia Pty Ltd |
Marlin B, Bass Strait |
Soils Investigation Scope and Execution |
|
Mustang Engineering Pty Ltd |
Timor Sea |
Blacktip Review of Post FEED suction pile design |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon/Jansz-Pipeline Soil Interaction/N1K Scarp Evacuation/N1K Interpretative Report/Sample Storage |
|
MMI Engineering |
USA |
Maleo Site Investigation Interpretation |
|
Coogee Resources (Ashmore Cartier) Pty Ltd |
Timor Sea |
Montara Project - Site Investigation Support |
|
ChevronTexaco |
Wheatstone Project, North West Shelf, Western Australia |
Geotechnical Support |
|
Esso Australia Pty Ltd |
Bass Strait |
Turrum B- Geotechnical Support |
|
Technip Oceania |
New Zealand |
Advice on Pipeline Scour Problem |
|
Arup |
MCR-A Project, Turkmenistan |
Turkmenistan (MCR-A) |
|
APL |
Montara Project, Timor Sea |
Geotechnical Design Report (Anchor Piles) |
|
Solid Energy New Zealand Ltd |
Mangatini Dam Project, New Zealand |
Mangatini Dam Project (Stockton Mine Site) -Testing & Numerical Modelling of Sludge Consolidation Behaviour |
|
Woodside Burrup Pty Ltd |
Pluto Project, North West Shelf, Western Australia |
Backfill Liquefaction Study & Pipeline Flotation Assessment |
|
Noble Denton Consultants Ltd |
SE Asia |
General Advice - Jack-up Sites |
|
Arup |
Maari Project, New Zealand |
Secondment of Personnel |
|
Coogee Resources(Ashmore Cartier) Pty Ltd |
Montara Project, Timor Sea |
Montara Project - Mudmats |
|
Woodside Burrup Pty Ltd |
Pluto Project, North West Shelf, Western Australia |
Geotechnical Support for Platform Concept Selection |
|
Woodside Energy Ltd |
PoG Project, North West Shelf, Western Australia |
PoG - Review Foundation Capacity for Subsea Structures |
Year 2006
|
|
|
|
Technip Oceania |
Kupe Project, New Zealand |
Kupe Trenching Enquiry |
|
J P Kenny |
Pluto Project, North West Shelf, Western Australia |
Pipeline Engineering Support |
|
Mustang Engineering Pty Ltd |
Blacktip Project, Joseph Bonaparte Gulf, Northern Australia |
Foundation geotechnical design FEED |
|
Atteris Pty Ltd |
First Trunkline Life Extension Project, North West Shelf, Western Australia |
Seabed liquefaction studies |
|
Technip Oceania Pty Ltd |
Vincent Development, Western Australia |
Riser base foundation design |
|
Inpex Browse |
Ichthys Development, Timor Sea |
General geotechnical support |
|
Woodside Energy Limited |
Pluto Development, North West Shelf, Western Australia |
Foundation engineering basis of design |
|
Woodside Energy Limited |
Pluto Development, North West Shelf, Western Australia |
Conceptual foundation engineering support |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Well casing design |
|
Coogee Resources |
Montara Project, Timor Sea |
Geotechnical support – spudcan penetration, anchor pile design & hole stability analysis |
|
BHP Billton |
Stybarrow Project, Western Australia |
Detailed design verification of SDU foundations |
|
BHP Billton |
Stybarrow Project, Western Australia |
Design review of riser holdback anchors |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
HDD interpretative report |
|
JP Kenny |
Greater Gorgon Project, North West Shelf, Western Australia |
Pipeline-soil interaction |
|
Woodside Energy Limited |
Enfield Development, Western Australia |
Review of suction pile design |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Geotechnical interpretative report – Io manifolds, pipelines & flowlines |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Geotechnical interpretative report – Jansz manifolds, pipelines, flowlines & scarp crossings |
|
Woodside Energy Limited |
Pluto Development, North West Shelf, Western Australia |
Preliminary foundation design |
|
Woodside Energy Limited |
Pluto Development, North West Shelf, Western Australia |
Geotechnical interpretative report |
|
BHP Billiton |
Stybarrow Project, Western Australia |
Sizing of SDU foundations |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Geotechnical interpretative report – Gorgon manifolds, pipelines & flowlines |
|
Year 2005 |
|
|
|
Apache Energy Ltd |
Stag Development, Western Australia |
Strategic anchor review |
|
Icon |
Talisman Development |
Review of suction piles |
|
JP Kenny |
Angel Project, North West Shelf, Western Australia |
Detailed geotechnical design – : foundations for Angel tie-in structures |
|
Woodside Energy Limited |
Vincent Project, Western Australia |
Offshore technical supervision –geotechnical site investrigation |
|
KBR Pty Ltd |
Bream B CGS, Bass Strait, Victoria |
Assessment of foundation stability, scour & scour protection schemes |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Offshore technical supervision –geotechnical site investrigation |
|
BHP Billiton |
Pyrenees Project, Western Australia |
Geotechnical support |
|
Technip Oceania Pty Ltd |
Wanaea Gas Lift Project, North West Shelf, Western Australia |
Detailed geotechnical design of subsea structure foundations |
|
Woodside Energy Limited |
Angel Project, North West Shelf, Western Australia |
Pipeline & umbilical friction factors |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon preliminary pipeline & manifolds |
|
BHP Billiton |
Stybarrow Project, Western Australia |
Geohazard/seismic studies |
|
Woodside Energy Limited |
Angel Project, North West Shelf, Western Australia |
FEED engineering support |
|
ChevronTexaco |
Greater Gorgon Project, North West Shelf, Western Australia |
Gorgon geohazard studies |
|
Woodside Energy Limited |
Perseus over Goodwyn Project, North West Shelf, Western Australia |
Detailed geotechnical design of subsea structure foundations |
|
BHP Billiton |
Stybarrow Project, Western Australia |
Geotechnical interpretative report – FPSO anchors, pipeline & PLEMs |
|
ChevronTexaco |
Gorgon Gas Project |
Geotechnical support |
|
Inpex Browse Ltd |
Browse Basin, Western Australia |
Geotechnical support |
|
TSE JV |
Enfield Project, Western Australia |
Detailed design - Riser holdback anchor |
|
ExxonMobil |
Jansz Development, Western Australia |
Geotechnical investigation planning, slope stability analysis, casing analysis, seabed structure foundation design |
|
ExxonMobil |
Jansz Development, Western Australia |
Geotechnical Project Management |
|
BHP Billiton |
Stybarrow Project, Western Australia |
Geotechnical support, FPSO |
|
ChevronTexaco |
Gorgon Gas Project |
Coordination and planning - HDD shore crossing geotechnical investigations |
|
Upstream Petroleum |
Manta Project, Bass Strait |
SAL Mooring piling assessment |
|
Technip Coflexip Oceania |
WCLH, North West Shelf |
Subsea facilities for Wanaea Cossack Lambert Hermes gas lift - preliminary sizing |
|
Technip Coflexip Oceania |
WCLH, North West Shelf |
Subsea facilities for Wanaea Cossack Lambert Hermes gas lift - Detailed design |
|
Woodside Energy Limited |
Angel Gas Project, North West Shelf |
Final geotechnical investigation interpretative report |
|
Woodside Energy Limited |
Blacktip Gas Project, Joseph Bonaparte Gulf, Northern Australia |
Liquefaction testing for beach crossing trench backfill |
|
Woodside Energy Limited |
Chinguetti Project, Mauritania, West Africa |
Design review - Banda over-trwaling structure bucket foundations |
|
Gujarat Adani Port Ltd Mundra |
Gujarat Adani Port Mooring Facility, India |
Piling problem - technical assistance |
|
Woodside Energy Limited |
North Rankin, North West Shelf |
North Rankin flare support structure gravity foundation new anode skid foundation design |
|
Bureau Veritas, Malaysia |
Pohokura Project, New Zealand |
Dovumentation review |
Year 2004
|
|
|
|
ENSCO |
Trefoil, Bass Strait, SW Victoria, Australia |
50 year storm stability, jackup rig |
|
Woodside Energy Limited |
Angel Field, North West Shelf, Western Australia |
Preliminary foundation sizing phase 2 |
|
ConocoPhillips |
Bayu Undan Development, Timor Sea |
Geotechnical input for Phase 2 FE analysis, DN 450 pipeline |
|
ExxonMobil |
Jansz/IO, North West Shelf, Western Australia |
Geotechnical support pre FEED studies |
|
Energy Africa Limited |
Kudu Development, Namibia, South West Africa |
Review of applicability of driven and grouted piles |
|
Technip Coflexip |
Otway Gas Project, Offshore SW Victoria, Australia |
Construction support |
|
Woodside Mauritania Pty Ltd |
Banda Field, Mauritania, West Africa |
Over-trawling structure, gas injection well |
|
ExxonMobil |
Bass Strait, Offshore SW Victoria, Australia |
Jackup penetration study |
|
Origin Energy |
BassGas Yolla Development, Bass Strait, SW Victoria, Australia |
Offshore representation spudcan removal |
|
ConocoPhillips |
Bayu Undan Development, Timor Sea |
Review of friction factors for DN450 pipeline |
|
Origin Energy, New Zealand |
Kupe Development, New Zealand |
Pipeline liquefaction study |
|
Woodside Energy Limited |
Blacktip 1, Bonaparte Gulf, Northern Territory, Australia |
Nearshore geotechnical site investigation |
|
Cadeng Pty Ltd |
Cadeng Drag Anchor |
Back-analysis of test data |
|
Woodside Mauritania Pty Ltd |
Chinguetti Development, Mauritania |
Subsea hardware:satellite well & template foundation analysis review |
|
Woodside Energy Limited |
Otway Gas Project, Offshore SW Victoria, Australia |
Foundation design geotechnical support |
|
Woodside Energy Limited |
Perseus over Goodwyn, North West Shelf, Western Australia |
Preliminary foundation design SSIV structure |
|
Woodside Energy Ltd |
Perseus over Goodwyn, North West Shelf, Western Australia |
Final foundation design SSIV structure |
|
Woodside Mauritania Pty Ltd |
Banda Field, Mauritania, West Africa |
Geotechnical investigation interpretative report |
|
Woodside Energy Limited |
Blacktip 1, Bonaparte Gulf, Northern Territory, Australia |
Platform, pipeline & mooring system geotechnical interpretative report |
|
Woodside Energy Limited |
Enfield Development, North West, Western Australia |
Manifold review |
|
Woodside Energy Limited |
Perseus over Goodwyn, North West Shelf, Western Australia |
Preliminary foundation design, PLEM structure |
|
Origin Energy |
Trefoil-1, Bass Strait, South West Victoria, Australia |
Geotechnical support |
|
Technip Coflexip |
Otway Gas Project, Offshore SW Victoria, Australia |
Detailed foundation design |
|
ExxonMobil |
State of the Art Review |
Tension capacity of foundations |
|
Woodside Mauritania |
Banda and Tiof Fields, Mauritania, West Africa |
Offshore QC supervision |
|
Woodside Energy Limited |
Blacktip 1, Bonaparte Gulf, Northern Territory, Australia |
Offshore QC services |
|
Technip Oceania Subsea 7 Enfield Joint Venture |
Enfield Development, North West, Western Australia |
Anchor Design |
|
Clough Offshore |
Hazira Pipeline, Offshore India |
Geotechnical support |
|
Technip Coflexip |
Otway Gas Project, Offshore SW Victoria, Australi |
Platform Foundation Support Services |
|
Woodside Energy Limited |
Otway Gas Project, Offshore SW Victoria, Australia |
Geotechnical support, Jackup operations |
|
Woodside Energy Limited |
Perseus over Goodwyn, North West Shelf, Western Australia |
Pipeline Interpretative Report |
|
Clough Offshore |
Pohokura Platform & Pipeline, Taranaki Basin, New Zealand |
Tender support |
|
Intec |
Sunrise to Timor Leste Export Pipeline, Timor Sea |
Geohazards review |
|
Woodside Energy Limited |
Enfield Development, North West, Western Australia |
Offshore QC representation |
|
Woodside Energy Limited |
Otway Gas Project, Offshore SW Victoria, Australia |
Scour study |
|
Woodside Energy Ltd |
Otway Gas Project, Offshore SW Victoria, Australia |
Jackup review |
|
National Petroleum Construction Company |
PPSP Platform, Offshore, United Arab Emirates |
Piled foundations assessment |
|
Woodside Energy Limited |
Enfield Development, North West, Western Australia |
Laboratory testing, interpretative report |
|
ChevronTexaco |
Gorgon, North West Shelf, Western Australia |
Geotechnical Support |
|
ChevronTexaco |
IO/Jansz, North West Shelf, Western Australia |
Geotechnical Support |
|
Intec |
Maleo Field, Offshore South Madura, Indonesia |
Review of geotechnical data |
|
Woodside Energy Limited |
Perseus Field, North West Shelf, Western Australia |
Geotechnical support |
|
Intec |
Scarborough Field, North West, Western Australia |
Support buoy anchor design |
|
National Petroleum Construction Company |
Umm Shaif Field, United Arab Emirates |
Geotechnical Support Services |
|
Woodside Energy Limited |
Banda Gas Injection Well, Mauritania |
Geotechnical support |
|
Woodside Energy Limited |
Neptune Development, Gulf of Mexico |
Geotechnical support |
|
Subsea Developments |
Mutineer-Exeter Development, North West Shelf, Western Australia |
Foundation design – booster pump foundation bases. |
|
Woodside Energy Limited |
Chinguetti Development, Mauritania |
Assessment of jetted conductor capacity |
|
Woodside Energy Limited |
Enfield Development, North West, Western Australia |
Flowline friction factors |
|
Intec |
Gorgon Development, Western Australia |
Geotechnical studies - Scarp 3 |
|
Petro Technology Pty Ltd |
NT/P66 Nexus Energy Ltd, Bonaparte Gulf, Timor Sea |
Sea bed soil condition review |
|
Woodside Energy Limited |
Perseus Field, North West Shelf, Western Australia |
Pipeline friction factors |
|
Intec |
Scarborough Development, North West Shelf, Western Australia |
Foundation feasibility |
Year 2003
|
|
|
|
Saipem SA |
Bahr Essalam Subsea Production, Libya |
Geotechnical advice |
|
J P Kenny |
Energetech Wave Energy Generator Port Kembla, New South Wales, Australia |
Detailed design of anchor piles |
|
Origin Energy |
Kupe Development, New Zealand |
Site investigation scope of work |
|
Woodside Energy Limited |
Otway Gas Project, SW Victoria, Australia |
Inclined borehole investigation, Rifle Range |
|
BHP Billiton |
Minerva Pipeline, Otway Basin, Victoria, Australia |
Geotechnical advice |
|
ExxonMobil |
Yoho FSO, Nigeria |
Piggyback anchors design review |
|
Woodside Energy Limited |
Otway Gas Project, Offshore SW Victoria, Australia |
Pipeline Shore Crossing - Hydraulic fracture analysis |
|
Woodside Energy Limited |
Chinguetti Development, Mauritania |
Offshore QC representation, laboratory testing, interpretative report |
|
Woodside Energy Limited |
Kuda Tasi Development, Timor Sea |
Analysis of well conductors |
|
Genesis |
Abadi Field Development, Timor Sea |
Geotechnical input to concept selection |
|
Esso Australia |
Marlin Project, Bass Strait, Victoria |
Geotechnical support |
|
OMV Australia |
Sole Project, Bass Strait, Victoria |
Geotechnical advice and sampling plan for pipeline and umbilical route |
|
Woodside Energy Limited |
Enfield Development |
Preliminary foundation engineering |
|
Technip Coflexip Offshore |
TSEP Project, North West Shelf |
SSIV and spools uplift analysis |
|
Woodside Energy Limited |
Otway Gas Project, Offshore SW Victoria, Australia |
Preliminary engineering enalyses of platform foundations and jackup spudcans |
|
Woodside Energy Limited |
Chinguetti Development, Mauritania |
Jetted conductors review |
|
ExxonMobil |
Yoho FSO, Nigeria |
Anchor study |
|
Woodside Energy Limited |
Legendre, North West Shelf |
Spudcan penetration |
|
Technip Coflexip Offshore |
TSEP Project, North West Shelf |
Installation frame review |
|
J P Kenny |
Wave Energy Project, Port Kembla, NSW |
Anchor pile study |
|
BP China |
Yacheng Gas Y13, China |
Geotechnical support |
|
ConocoPhillips |
Bayu Export Project, Timor Sea |
Design criteria for SSIV and pipeline foundations |
|
Santos |
Mutineer/Exeter Project, North West Shelf |
Geotechnical support |
|
Woodside Energy Limited |
North Rankin A, North West Shelf |
Review of conductors |
|
Saipem Energy International |
Sabratha Platform, Bahr Essalam Field, Libya |
Review of pile axial bearing capacity |
|
Kvaerner Oil and Gas Ltd |
Triton FPSO, North Sea |
Expert review |
Year 2002
|
|
|
|
Technip Coflexip Offshore |
Bayu Undan Export Pipeline Project, Timor Sea |
Design of penetrometer |
|
ConocoPhillips |
Belanak Field Development, Natuna Sea |
Suction caisson capacity check |
|
Woodside Energy Limited |
North Rankin B, North West Shelf |
Geotechnical support |
|
KNOC |
Rong Doi Gas Field Development, Vietnam |
Review |
|
Intec |
Sole-2, Gippsland Basin, Bass Strait |
Anchor review |
|
BP |
Valhall IP Platform, North Sea |
Evaluation of piling problems |
|
Single Buoy Moorings |
Kizomba Field Development, Angola |
Design verification of suction anchor pile |
|
Intec Engineering |
ONGC F1 Field, India |
Preliminary review of FPSO anchoring options |
|
Woodside Energy Limited |
Shakespeare Field, Timor Sea |
Review of site investigation options |
|
Woodside Energy Limited |
Otway Gas Project, Offshore SW Victoria, Australia |
Planning and coordination of onshore gas plant sites, HDD shore crossing sites and offshore faciilities including subsea pipeline |
|
Origin Energy |
Yolla Project, Bass Strait |
Geotechnical assessment of well conductor installation |
|
Technip Coflexip Offshore |
Belanak Project, Natuna Sea |
Foundation design for mid depth buoy clump weight |
|
PetroSA |
Sable Field Development, South Africa |
Driveability review of final anchor pile design |
|
BP |
Tangguh Gas Project, Indonesia |
Assessment of jackup spudcan liquefaction |
|
Single Buoy Moorings |
Zafiro Project, Equatorial Guinea |
Suction anchor pile design |
|
Worley Limited |
Mutineer Field Development, Australia |
Anchoring advice |
|
Woodside Energy Limited |
Whitetail Field, Australia |
Analysis of well conductor axial capacity |
|
TotalFinaElf |
C-137 FPSO Project offshore Libya |
Drag anchor assessment |
|
Woodside Energy Limited |
Great Australian Bight |
Geotechnical assessment of conductors |
|
ECL |
Rong Doi Gas Field Development, Vietnam |
Offshore site investigation supervision |
|
Worley Limited |
Benchamas Field, Gulf of Thailand |
Geotechnical advice for Chevron MFP II Platforms |
|
Hallibuton KBR |
Kepodang Field Development, Indonesia |
Seismic assessment review |
|
Clough Offshore |
Yolla Development, Bass Strait |
Technical advice for platform design |
|
ExxonMobil |
Kizomba Field Development, Angola |
Review of axial pile capacity parameters |
|
Clough Offshore |
West Seno Field Development, Indonesia |
Pipeline stability review |
|
Granherne |
Yacheng Gas Field Development, China |
Pile driveability study |
|
Woodside Energy Limited |
Chinguetti, Mauritania |
Geotechnical support |
|
FOTCO Pakistan |
FOTCO Jetty 2 Breasting Dolphins, Pakistan |
Review of bucket foundations |
|
JP Kenny |
Tangguh Pipeline Detailed Design, Irian Jaya |
Geotechnical support |
|
Origin Energy |
BassGass Yolla Project |
Due diligence foundation review |
|
Woodside Energy Limited |
TSEP |
Detailed foundation design |
|
CAL Energy |
Yolla Project |
Independent due diligence review of tendered foundation options |
|
Suction Pile Technology, The Netherlands |
Burlington Calder Platform |
Verification suction pile design |
|
Woodside Energy Limited |
Vincent Enfield Development |
Foundation sizing |
Year 2001
|
|
|
|
Woodside Energy Limited |
TSEP |
Sizing of seabed structures |
|
Woodside Energy Limited |
Angel Development |
Geotechnical support |
|
Roam Marine |
Bayu Undan |
Mid depth buoy gravity base |
|
Phillips Petroleum |
Bayu Undan Development |
Spudcan penetration study |
|
Phillips Petroleum |
Bayu Undan Development |
Well conductor design |
|
JP Kenny |
Bayu Undan Pipeline |
Foundation design - Wye |
|
Woodside Energy Limited |
Blacktip Project |
Geotechnical support |
|
Sage Engineering Limited |
Escravos GTL Project |
Foundation engineering |
|
Worley Limited |
Rang Dong Project |
Geotechnical support |
|
Granherne |
Yacheng Gas Development |
Geotechnical support |
|
Soekor E & P Pty Ltd |
Sable Field Development, South Africa |
Site survey supervision |
|
Coflexip Stena Offshore |
Griffin Development |
Pipeline stability analysis |
|
Coflexip Stena Offshore |
Nam Con Son Gas Development |
SSIV station detailed foundation design |
|
Woodside Energy Limited |
Second Trunkline Project |
Geotechnical support |
|
Clough Offshore |
UNOCAL, Gulf of Thailand |
Subsea oil storage unit design |
|
Phillips Pipeline Australia |
Bayu Undan Development |
Interpretation of Wye geotechnical investigation data |
|
Coflexip Stena Offshore |
Lan Tay |
SSIV foundation design |
|
Woodside Energy Limited |
Sandbar |
Jackup spudcan assessment |
|
Woodside Energy Limited |
Sunrise Gas Project |
MOPU spudcan verification |
|
Woodside Energy Limited |
Blacktip Project |
Jackup spudcan assessment |
|
Thales |
Bream Geotechnical Investigation, Bass Strait |
Supervision |
|
Woodside Energy Limited |
Laminaria Development |
Phase 2 conductor design |
|
Clough Offshore |
UNOCAL, Gulf of Thailand |
Condensate line PLEM design |
|
Kvaerner Oil & Gas |
Bambra Field |
Foundation design - minimum facility platform |
|
AGIP Australia |
Woollybutt Project |
Geotechnical support |
|
Kvaerner Energy & Construction |
Betara Complex |
Anchor installation - geotechnical support |
|
Amec |
Second Cruise Terminal, Dover, United Kingdom |
Study of driven plugged pile response |
|
Woodside Energy Limited |
Second trunkline project |
Study of soil response to cyclic loading of pipelines |
|
TotalFinaElf |
Girassol Project |
Review of suction anchor pile design |
|
Kvaerner Oil & Gas |
Lan Tay |
Manifold casing design |
|
Woodside Energy Ltd |
Thylacine and Geographe wells, Ottway Basin |
Well design |
|
Coflexip Stena |
Wenchang Gravity Base Structure |
Scour assessment |
|
Unocal |
Review of Myanmar Y2Y pipeline installation, Rangoon River, Burma2 |
Review of riverbed morphology, anchor penetration, pipeline stability and scour potential for proposed pipeline |
Year 2000
|
|
|
|
JP Kenny |
SSIV Structure Foundation Design, Echo Yodel Project |
Preliminary and detailed geotechnical design of mudmat foundation for SSIV structure |
|
Icon Engineering |
Soil Modelling of Casing at Cowle 1 Location, North West Shelf |
Geotechincal design of laterally loaded casings |
|
Tamboritha |
Geotechnical Design Review, Seabed heat exchanger, Griffin Infill Project |
Verification of the geotechnical design of the foundations for a seabed heat exchanger |
|
APL |
Bayu Undan Anchor Piles - Pre-study |
Preliminary geotechnical design of laterally loaded anchor piles for Bayu-Undan FSO |
|
Woodside Energy Limited |
Echo Yodel Core Logging and Lab Testing |
Core logging and supervision of testing schedule |
|
Woodside Energy Limited |
Lambert 5 Well Casing Verification |
Geotechnical casing design for Lambert-5 well |
|
Coflexip Stena Offshore Asia Pacific |
Legendre CALM Mooring Point Detailed Design |
Detailed geotechnical design of laterally loaded anchor piles for CALM mooring point |
|
Coflexip Stena Offshore Asia Pacific |
Legendre PLEM preliminary Design |
Preliminary design of pipeline end manifold |
|
Shell Exploration BV |
Soroosh Nowrooz Site Investigation, Iran |
Offshore site investigation supervision |
|
Woodside Energy Limited |
Sunrise Troubador Project, Timor Sea |
Geotechnical support |
|
Woodside Energy Limited |
Well Casing Verification, Greater Wanaea Area |
General geotechnical design solution for wells located in the Greater Wanaea Area |
|
Kvaerner Oil and Gas2 |
Chevron Thailand Minimum Platform study2 |
Evaluate alternative foundation options for platform in the Gulf of Thailand2 |
Year 1999
|
|
|
|
PNG Gas Project |
Geotechnical support, platform facility, Papua New Guinea |
Site survey planning, supervision and preliminary engineering |
|
Woodside Energy Limited |
Vincent Enfield Development, Western Australia |
Preliminary geohazards work |
|
Sage Engineering Limited |
Escravos Gas to Liquids Project, Nigeria |
Raft foundation design |
|
Woodside Energy Limited |
Sunrise Troubadour Loxton Shoals, Timor Sea |
Preliminary geohazards work |
|
TIGA Joint Venture |
Bayu Undan Development, Timor Sea |
Gravity Base Foundation Study |
|
PNG Gas Project |
Geotechnical support, platform facility, Papua New Guinea |
Risk assessment of alternative foundation concepts |
|
Apache Energy |
Wonnich pipeline pin pile installation |
Field supervision, survey and logging of installation of pin piles |
|
Japan Vietnam Petroleum Company |
Rang Dong 1st Phase Development Extension, Offshore Vietnam |
Geotechnical Feasibility Study |
|
EDR Hydrosearch |
Site Investigations, Bohai Sea, P R China, for EXXON |
QC Representation during fieldwork and reporting phases |
|
JP Kenny |
West Natuna Sea Gas Development Subsea Structure Foundation design |
Conceptual and detailed geotechnical design of subsea structure foundations |
|
JP Kenny |
West Natuna Sea Gas Development Subsea Structure Foundation design |
Conceptual and detailed geotechnical design of subsea structure foundations |
|
Clough Offshore |
Buffalo Riser Clump Weight Analysis |
Design of gravity bases for the Buffalo flow line on the Big Bank side slope |
|
Nortrans Offshore |
Evaluation of Spudcan Penetration, Marine 306, Legendre |
Spudcan penetration predictions for jack-up preloading |
|
Woodside Energy Limited |
Geotechnical Data for Seismic Enhancement Project, NWS |
Using geotechnical data to predict geophysical responses of NWS sediments |
|
Woodside Energy Limited |
Goodwyn A Pile Review |
Evaluation of axial pile capacity under random cyclic loading |
|
Civil & Coastal Construction Pty Ltd |
Mossgas Control Buoy GBS Design, South Africa |
Detailed foundation design and installation |
|
ABB |
Pile Analyses, Anoa Site, Natuna Sea, Indonesia |
Foundation classification for a steel jacket structure |
|
Woodside Energy Limited |
Scott Reef and Claudea - 1998 Preliminary Investigation |
Detailed logging and testing of drop cores recovered from 1998 preliminary investigation |
|
Amerada Hess Ltd |
Triton Drag Anchor Remedial Analysis |
Evaluation of remedial measures for improving drag anchor capacities |
|
Apache Energy |
Wonnich Pipeline, Pin Pile Stabilisation |
Development of failure mechanisms and geotechnical design of pin piles. |
|
Woodside Energy Limited |
Enfield Site Survey, Rig Anchoring and TGB Stability |
Drag anchor capacity verification for rig mooring and TGB stability analysis. |
|
CSK Joint Venture |
Lambert 3 Conductor Analysis, Lambert Hermes Phase IIA Development |
Site characterisation and lateral, axial and torsional analysis of grouted conductor. |
|
Coflexip Stena Offshore |
Blackback Development |
Riser pull-in assessment at Mackerel Platform |
Year 1998
|
|
|
|
Shell Exploration and Production, Namibia |
Kudu Development |
Client representation, geotechnical investigation |
|
Amoco Corporation, USA |
Software Development |
Suction anchor analysis |
|
Amerada Hess Ltd |
Triton Project |
Drag anchor design verification |
|
Woodside Energy |
Goodwyn A, North West Shelf, Western Australia |
Foundation re-assessment |
|
Woodside Energy |
LNG Expansion Project, Burrup Peninsular, Western Australia |
Geotechnical advice for LNG jetty extension foundations |
|
Woodside Energy |
Greater Echo-Yodel Area and Goodwyn South |
Preliminary geotechnical assessment |
|
West Australian Petroleum |
Gorgon LNG Plant Site. Offshore Geotechnical Investigation, Burrup Peninsular, Western Australia |
Preliminary foundation assessment for MOF wharf, LNG jetty , turning basin and approach channels |
|
BRK Joint Venture |
North West Shelf Second Trunkline Project |
Pipeline Liquefaction Study |
|
Woodside Energy |
Legendre Development |
Planning and supervision of geotechnical site investigation, laboratory testing and reporting. |
|
Esso Australia |
Blackback Development, Bass Strait, Victoria |
Well casing analyses |
|
CSK Joint Venture |
Laminaria and Corallina Development, Timor Sea |
Riser base design verification, installation procedures review, TGB stability assessment, suction pile installation contingencies |
|
Unocal Corporation |
Drilled and Grouted Pile Design |
Technical advice on design and installation of drilled and grouted piles in soft clays |
|
Woodside Offshore Petroleum |
Geotechnical support |
Geotechnical support and planning for several new developments |
|
West Australian Petroleum |
Gorgon Development, Feed Engineering |
Coordination of geotechnical activities including planning and supervision of geotechnical investigation for remote hub platform. |
|
Premier Oil |
Site Survey, Natuna Sea |
Site survey supervision in vicinity of Anoa platform |
|
Coflexip Stena Offshore |
State of the Art Review - Rock Cutting Mechanics |
Literature review into mechanics of rock cutting, specifically for ploughing through rock |
|
CSK Joint Venture |
Manifold Pile Design Review |
Technical review of the pile design for Laminaria manifolds |
|
Kvaerner Oil and Gas |
Blackback PTA Design |
Detailed design of mudmats for PTA in calcareous silty sand |
|
Esso Australia |
Blackback TGB and OHA |
Analyses of stability and settlement for TGB and OHA |
|
CSK Joint Venture |
Laminaria Central - PLEM Mudmat Design |
Detailed design of PLEM mudmats in calcareous mud |
|
CSK Joint Venture |
Laminaria FPSO - Anchor Installation Study |
Analyses of geotechnical aspects of suction pile installation |
|
BRK Joint Venture |
North West Shelf Second Trunkline Project |
Review of pipeline anchor pile design |
|
BRK Joint Venture |
Anchor Pile Design for 2nd Trunkline Project |
Preliminary design of rock anchors for pipeline stability |
|
BOS Australia |
Apache Stag Central Production Facility - Geotechnical Support |
Technical audit of pile design and installation |
|
Heeremac |
Engineering Support - Grouted Driven Piles |
R& D program into GDP including supervision of model tests and engineering of prototype piles |
|
Racal Survey Australia |
Geotechnical Interpretation of Marine Facilities Site Survey, Glyde Point, Northern Australia |
Interpretation of engineering issues from geophysical survey results |
|
WAPET |
Gorgon Development FEED Engineering |
Geotechnical coordination |
|
CSK Joint Venture |
Laminaria and Corallina Development Alternative Manifold Support Design |
Shallow foundation preliminary design |
|
Woodside Offshore Petroleum |
Slope Stability - Karmt Shoals |
Slope stability analyses of cemented and uncemented shoal slopes under seismic conditions |
|
Woodside Offshore Petroleum |
Well Conductor Design |
Geotechnical design of well conductors and TGB base |
Year 1997
|
|
|
|
TIGA Joint Venture |
Bayu Undan Preliminary Engineering |
In-house geotechnical coordination and foundation design |
|
Racal Survey Australia |
Geotechnical Interpretation of Bayu Undan Pipeline Reconnaissance Survey |
Interpretation of pipeline engineering issues from geophysical survey results |
|
Global Offshore Pty Ltd |
Stag Development Pipeline End Manifold Design |
Geotechnical analysis to establish stability of PLEM foundations |
|
Coflexip Stena Offshore |
Subsea Heat Exchanger Foundations, Elang Development |
Review of geotechnical data and foundation design and determination of breakout loads |
|
SIEP/NGI |
Malampaya Front End Engineering |
Laboratory test interpretation, design parameter interpretation and shallow foundation design |
|
BHP-Phillips |
Bayu-Undan Infield Foundation Design |
Design of all subsea foundation systems for the Bayu-Undan Infield Development |
|
BHP |
Bayu-Undan Offshore LNG Soil Reaction Study |
Evaluation of soil reactions for offshore LNG Concrete Gravity Base Structures |
|
WAPET |
Foundation Screening Studies, Alternative Development Concepts |
Evaluation of foundation responses for alternative developments and preparation of site investigation scope of work |
|
Woodside Offshore Petroleum |
Laminaria and Corallina FPSO Suction Anchors |
Design review and verification including centrifuge test modelling |
|
Woodside Offshore Petroleum |
Onshore LNG site supervision |
Onshore site investigation supervision |
|
Woodside Offshore Petroleum |
Laminaria and Corallina Final Site Investigation |
Site investigation planning and supervision. Ongoing support during laboratory testing and parameter evaluation phases |
|
CSK Joint Venture |
Laminaria Conductor Response |
Evaluation of axial capacity of existing well conductors |
|
SIEP |
Malampaya Foundation Basis for Design |
Preparation of a BFD for front end engineering studies |
|
Racal Survey Australia |
Blackback Site Investigation |
Supervision of Site Investigation and interpretive reporting for pipeline and subsea completion |
|
Woodside Offshore Petroleum |
Goodwyn A Pile Review |
Review into work required to upgrade pile capacity |
|
SIEP |
Malampaya Site Investigation |
Supervision of site investigation |
|
Port & Harbour Consultants |
Tanjung Lesung Marina, Indonesia |
Geotechnical Detailed Design including slope stability and seismic liquefaction assessment |
|
Worley Limited |
Bayu Undan Foundation Studies |
Preliminary engineering for insert piles, mudmats, spudcan/pile interaction and future SI planning |
|
West Australian Petroleum |
Gorgon - Deep Skirted Raft Option |
Foundation sizing and settlement assessment including FE analyses of underbase drainage system |
|
John Holland/Aker J.V. |
Gorgon - Shallow water GBS Option |
Preliminary foundation engineering for a GBS foundation on calcareous sand and silt |
Year 1996
|
|
|
|
Kvaerner RJ Brown |
Stag FSO Anchor Pile Detailed Design |
Final geotechnical design of grouted pile/chain system in hard soil for permanent FSO facility |
|
Woodside Offshore Petroleum |
Laminaria and Corallina Preliminary Site Investigation |
Site investigation planning and supervision. Ongoing support during laboratory test and parameter evaluation phases |
|
West Australian Petroleum |
Chrysaor Foundation Screening Study |
Sizing of a range of foundation options for tension leg and catenary moored systems |
|
Woodside Offshore Petroleum |
Geotechnical Planning |
Future planning for Site Investigation, Laboratory testing and Engineering of N.W. Shelf Gas Expansion project |
|
John Holland/Aker J.V. |
Bayu-Undan Offshore LNG |
Preliminary foundation design for gravity based structure on carbonate gravel bank, Timor Sea |
|
Woodside Offshore Petroleum |
Grouted Driven Piles - State of the Art Review |
Review of the grouted driven pile concept, and recommendations on further development |
|
Worley Limited |
Bayu Undan Foundation Screening Studies |
Foundation screening studies for a range of structures including steel jackets, concrete gravity structures and floating facilities |
|
Esso Australia |
Scarborough Foundation Screening Study |
Sizing of a range of foundation options for tension leg and catenary moored systems |
|
West Australian Petroleum |
Speciality Testing Engineering |
Engineering for the development of speciality tests at the Gorgon location to evaluate deep and shallow foundations |
|
Kvaerner RJ Brown |
Stag FSO Anchor Studies |
Recommendation of foundation types in hard soil for catenary moored floating facilities |
|
Port & Harbour Consultants |
Geotechnical Assessment for Feasibility Studies for Marina, Philippines |
Geotechnical assessment for input to a feasibility study of two proposed residential marina sites |
|
J P Kenny |
Woodside 2nd Trunkline - Ploughing Design Review |
Review of plough design for varying calcareous soil profiles |
|
Woodside Offshore Petroleum |
Laminaria and Corallina Development Geotechnical Coordination |
In-house coordination of all geotechnical activities as part of the LCST |
|
Coflexip Stena |
Maui B End Fitting Foundation |
Evaluation of the potential burial and breakout resistance of flowline end fitting |
|
Dawson Brown & Root |
Wandoo CALM Buoy Anchor Design |
Final design of drag anchors in hard soil conditions, comprising rock bund to increase anchor capacity |
|
West Australian Petroleum |
Gorgon Foundation Special Studies |
Foundation design for a range of concepts at the Gorgon location, including grouted piles and gravity base structures |
Year 1995
|
|
|
|
Shell International Exploration and Production |
Creep Effects for Tension Piles in Carbonate Soils, Malampaya Field, The Philippines |
Research report into the extent of creep imposed on piles subjected to long term tension by a TLP structure |
|
West Australian Petroleum |
Gorgon Foundation Screening Studies |
Engineering of drilled & grouted and grouted driven pile foundations |
|
West Australian Petroleum |
Gorgon Preliminary Site Investigation |
Site supervision during site investigation activities. Lab test coordination and selection of engineering parameters for design |
|
Shell Offshore Inc. |
Group Pile p-y Response, Ursa TLP. |
Recommendation on lateral group pile response for a tension leg platform in 1300 m water depth |
|
Worley Limited |
Shallow Water Platform Foundation Assessment, Laminaria |
Screening study for a development on shallow carbonate banks, Timor Sea |
|
Coflexip Stena |
Maui B Flowline Foundations |
Evaluation of burial and lateral resistance of submarine flowlines |
|
Woodside Offshore Petroleum |
Laminaria Foundation Concept Screening Study |
Sizing of a range of foundation options for proposed floating facilities. |
|
Coflexip Stena |
Maui B Clump Weight Foundations |
Cyclic analyses of clump weight foundations for mid-depth buoys |
|
Woodside Offshore Petroleum |
Laminaria Geotechnical Design Criteria |
Development of preliminary geotechnical design criteria based on geophysical and drop core data |
|
Kinhill Riedel & Byrne |
Geotechnical Investigation Point Samson fishing Jetty |
Site investigation, pile design and installation recommendations for new jetty structure |
|
Coflexip Stena |
Maui B Riser Base Assessment |
Preliminary sizing of a gravity base for a dynamic riser system |
|
Port & Harbour Consultants |
Geotechnical Review Preliminary Planning Tanjung Lesung Marina, Indonesia |
Review of data and development of geotechnical design parameters for edge treatments of a proposed residential marina |
|
West Australian Petroleum |
Gorgon Development |
Preliminary deep foundation design for jacket structure, including drilled & grouted and grouted driven piles |
|
J P Kenny |
Wanaea Riser Base Design Verification |
Foundation verification for riser and umbilical bases |
|
Wandoo Alliance |
Wandoo B Site Investigation Support |
Technical representation during site investigation activities |
Year 1994
|
|
|
|
Woodside Offshore Petroleum |
Goodwyn ‘A’ Foundation Capacity Reassessment |
Reassessment of the capacity of the Goodwyn ‘A’ foundations for safety case preparation |
|
T L Geotechnics, Malaysia |
ONGC Site Investigations, India |
Site investigation supervision and preliminary foundation engineering for a series of platform and jackup foundations |
|
Woodside Offshore Petroleum |
North Rankin ‘A’ Foundation Capacity Re-assessment |
Reassessment of the capacity of the North Rankin ‘A’ foundations for safety case preparation |
Year 1993
|
|
|
|
Esso Australia |
Marlin Project, Bass Strait, Victoria |
Geotechnical support |